A landfill built for 8 million tenge near Semey fell apart a year after construction
A temporary waste storage site in the village of Ozerki, Zhanasemei district, Abai region, built in 2023 for 8 million tenge, has fallen into a state of disrepair. According to local residents, part of the fencing has collapsed, and the waste has spread far beyond the designated area.
Фонд-бюро расследования коррупции